1 Your electricity use

Set your current peak demand, then choose the lower peak you want the battery to achieve.

Shape your peak. Find your battery.

Plan a backup project · Real products and engineering RFQ →

C&I · Preliminary planning tool

Commercial Battery Backup Calculator

Estimate battery size from the load and outage time. Add project details later.

01 · Estimate02 · Configure03 · Review

Quick estimate

Enter the critical load

Enter the total running power that must stay on and the backup hours.

Combined running power of loads that must stay on.

Critical load is the running power of equipment that must stay on during an outage.

Longer backup time requires more stored energy.

Sizing assumptions

DoD 90% · Discharge path efficiency 92% · Usable capacity factor 90%.

Nominal battery = load × hours ÷ (0.90 × 0.92 × 0.90). Engineering must check whether these factors overlap.

Preliminary estimate

Waiting for backup inputs

Enter the critical load and backup duration to see an estimate.

Preliminary sizing estimate. Final system configuration requires engineering review.

Add grid, generator, PV, and motor information to make a fuller project brief. Those details do not change this backup estimate.

About this estimate

A starting point for your project

Why ask for critical load?
Daily site energy describes total use over a day. Backup energy depends on which loads must stay on and for how long.
How is battery capacity estimated?
The tool multiplies critical load by backup hours, then adjusts for the stated planning assumptions. Grid, generator, PV, and daily energy provide context only.
What happens next?
A TAICO specialist can review the load profile, starting currents, grid conditions, PV, and generator details before recommending a system configuration.