
TKS E-Cube R200P-241
Cabinet ESS
Higher-capacity outdoor cabinet ESS at 241 kWh with 125 kW-class hybrid output and up to 10-unit parallel expansion.
- Capacity
- 241 kWh
- Power
- 125 kW
AI-generated illustrative application context, not a customer project.
System at a glance
The published TKS E-Cube R200P-241 platform
Higher-capacity outdoor cabinet ESS at 241 kWh with 125 kW-class hybrid output and up to 10-unit parallel expansion.
- Capacity
- 241 kWh
- Rated power
- 125 kW
- Protection
- IP54
- Catalog
- V1.9 / P25
Use cases
- Commercial energy storage
- PV-storage systems
- Distributed storage plants
Capabilities
- +High-capacity outdoor cabinet architecture
- +Solid lithium cell with multi-level protection and fire suppression
- +Hybrid PV string input and three-phase AC output

Deployment context
Designed for deployment at scale
From an individual product platform to a coordinated site layout, system quantity and electrical architecture remain project-specific.

Catalog specification
Technical details
Published from TAICO C&I ESS Brochure V1.9, page 25.
| Battery capacity | 241 kWh |
|---|---|
| Rated / output power | 125 kW |
| Rated voltage | System nominal 768 V |
| Cell type | Solid-state 314 Ah |
| Cycle life / duty | ≥8000 cycles · 95% DoD |
| Working temperature | Charge 0–55 °C / discharge −20–55 °C |
| Related capacities | 208 / 225 / 241 kWh |
| Pack capacity and configuration | 16.076 kWh / 1P16S |
| Pack quantity | 13–15 |
| Battery voltage range | 648–876 V class |
| Charge/discharge rate | ≤0.5C |
| Rated AC output power | 125 kW class hybrid inverter pairing |
| Max DC input power | 240 kW |
| MPPT range | 150–950 V |
| Optional inverter brands | TAICO / DEYE / GROWATT / SOLIS |
| Parallel operation | Up to 10 units |
| Size | 1150 × 2114–2366 × 1260–1280 mm |
| Weight | Catalog cabinet system |
| Protection level | IP54 |
Compatibility reference
Battery and inverter ecosystem
A published reference of TAICO battery-cell partners and compatible inverter brands. Final cell, inverter, and certification scope must be confirmed for each project.

Explore by challenge
Peak Shaving & Demand Charge Reduction
Shift industrial and commercial load away from expensive peak windows.
Data Center Energy Storage
Improve power reliability while capturing peak-shaving economics.
PV + Storage + Charging
Absorb PV surplus and serve EV charging without overloading the grid connection.
Related products
Configure TKS E-Cube R200P-241 for your project
Share your load, power, PV, grid, and deployment requirements with the TAICO ESS team.




